Return To Opening Page Drilling Services Pressure Systems Geothermal Systems Chlorination Systems Well Upgrades Industry Links Contact Us

Well Upgrades

drilled wells with pitless adapters diagram

 

Before the pit less adapter was widely used in the industry the wells were not finished above normal ground level, but instead were finished in a pit constructed below the frost line.

This type of construction can lead to contaminated wells if the pit is not kept absolutely dry all year round.

The well can become a drain for water and debris that can collect on the pit floor. If this construction method sounds like your own well, we can extend it above ground.

This also makes it easier to access your pump or lines.


MacKinnon Well Drilling Ltd.
2497 B-Line Road, Pembroke, Ontario K8A 6W8
Tel: 613-732-4923 | info@mackinnondrilling.com

Copyright 2010. All rights reserved.

Business Class Internet Hosting Powered By SmilingHost.com
TUBMAN Marketing Inc. provides Site Maintenance